In this article
Global-TALKE, a specialist in logistics solutions for the chemical and food industries, has begun Phase 2 works at its site in the Riu Clar industrial estate (Tarragona). The project involves the construction of a 9,600 m² warehouse (on a 22,000 m² plot) with capacity for 14,600 tonnes of goods and 8 independent sections equipped with the latest fire prevention and protection technology.
“This milestone strengthens our mission of Pioneering the Future by offering more capacity, more safety and a minimal environmental impact,” says Víctor Gil, General Manager of Global-TALKE.
Image gallery




Safety and sustainability at the heart of the project
- Fire protection system with automatic sprinklers, high-flow hydrants and a 1,726 m³ reserve tank.
- Low-consumption LED lighting and assisted natural ventilation, guaranteeing energy efficiency.
- Filtered rainwater collection network and sealed spill containment tank, in line with Catalan environmental regulations.
A boost for the local economy, and how long the works will take
The new phase will create direct and indirect jobs and consolidate Tarragona as the chemical logistics hub of the Mediterranean arc, thanks to its proximity to the port and to the AP-7, A-7 and A-27 motorways.
The works will take approximately 12 months, and commissioning is scheduled for the second half of 2026. With this expansion, the total area operated by Global-TALKE in Spain will exceed 120,000 m².
Global-TALKE: your logistics partner
Global-TALKE is a benchmark logistics partner for the chemical and consumer goods sectors, with more than 75 years of experience and a presence in Europe, the Middle East, Asia and the Americas. Under the motto “Safety first” and with a firm commitment to sustainability, it offers storage, transport and value-added services along the entire supply chain.
